Concrete pad for storage building

We have completed the installation of a concrete pad and walk for the new storage building expected in early 2019. Pad was installed for a 14' x 20' building to house pool furniture, golf cart and miscellaneous items stored in equipment room at this time. A gate will be installed early spring to access the building from south side also. Electric is planned for building for golf cart and lighting. Completion date should be sometime between March and May.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square