Road Construction

Road repairs throughout the community will be scheduled sometime in late September. An inspection on all asphalt surfaces will be done prior to contractor's bid. Procedures for repairs will consist of grinding out bad areas at a depth of 2 1/2" and repairing with new asphalt. These repairs will be done before winter to eliminate areas from deteriorating more through freezing and thawing during winter months. Crack sealing and Seal coating will be scheduled after the repairs.

Notifications will be sent out to Community prior to any road closures or work.Please remember to not park on newly repaired areas for a few days. Do not turn your wheels while sitting still on newly repaired areas as it may heave new asphalt before it has time to cure.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square